Hoisting with a crane on a raft

High risk operation that requires several engineering studies.

Construction of a bridge over the Tietê River, SP / Source: Personal archive.

In addition to the lifting project (rigging plan), the following studies are required:


1) Static stability of the raft
2) Dynamic stability of the ferry
3) Dynamic analysis of load and crane
4) Structural strength for support and deck load
5) Ferry docking plan
6) Maritime operation
7) Crane lashing on the ferry
8) Crane loadout

TechCon Scope:


– Advice on ferry approval
– lifting project
– Deck integrity analysis and structural reinforcement design
– Crane lashing project on the ferry

Other studies prepared by the shipowner.