Hoisting in areas not accessible by cranes requires tailor-made solutions for each case.
SITUATIONS
🔸 Internal areas of platform modules, where the crane only reaches the upper level.
🔸 Inside electrical rooms, engine rooms, powerhouses.
🔸 Inside warehouses with low ceiling height.
🔸 Substations with live overhead power lines.
🔸 Hard-to-reach areas, such as rooftops of tall buildings, shafts, tunnels, and railway bridges.


TECHCON RIGGING PLAN
🔸 Process piping on offshore platforms.
🔸 Removal and installation of large-diameter piping in locations not accessible by crane.
🔸 Structural verification of temporary hoisting points for horizontal and vertical loads.
🔸 Verification of deck and walkway resistance to withstand load movements.
🔸 Detailed and customized definition of hoisting point positioning.
🔸 Detailing of vertical and horizontal movement.
🔸 Individual project for load handling using chain hoists.
🔸 Securing project for horizontal load transport inside the platform and for maritime transport.