Transformer handling and lifting design

Photo: Author’s archive.

Goals:

– Horizontal removal of the existing transformer
– Weighing for weight and CG checking
– Hoisting
– Pawn for transport
– Horizontal movement of the new transformer
– Lifting for assembly of the new transformer

TechCon project scope:

– Lifting design (rigging plan) of transformers
– Horizontal movement design
– Design of the jacking to rotate the casters

TechCon Field Scope:

– Structural inspection in the field
– Monitoring forces during horizontal movement
– Weighing and determination of GC
– Supervision of operations
– Technical support to the automaker

TechCon Team:


Carlos Henrique Brito Scoton
Débora Maia Guimarães
Leonardo Roncetti

Execution: Rede Montagens Eletromecânicas
Coordinator: Marcus Ferreira (https://lnkd.in/ekw5qWK)
Engineer: Daniel Portela (https://lnkd.in/egrhkSc)
Assembly supervisor: Lincoln Ferreira

Cranes: Locar Guindastes e Transportes Intermodais

Final client: Vale

All operations were carried out successfully, safely and on time.